3 Votos (3.33 Promedio) y 307 Vistas  

N8413D — - This Bell 47-G5A aircraft went through a total Ground-up Restoration and Complete Rebuild by a team of experienced BH47 technicians. Restoration completed in May 2014. Annual and 1200 Hour inspection completed May 2014 per Bell manuals All Applicable Airworthiness Directives and Service Bulletins complied with Aircraft fully disassembled to facilitate inspection, repairs and restoration. Removed existing wiring and installed new wiring, installed new scissor assemblies, installed new scissors bracket, NDT inspection of center engine frame and tailboom frame (treated with corrosion preventative materials), all new fuel, oil and hydraulic hoses, aircraft reassembled with all new hardware, installed overhauled hydraulic servos, installed overhauled engine accessories, installed boosted collective. Main Rotor transmission, main rotor hub, mast, swashplate and tail rotor gearbox received 1200 hour overhauls. All other lifed parts are completely tracked and have either been overhauled to factory spec or replaced.
/images/icons/csMagGlass.png Tamaño intermedio / Tamaño real

N8413D —

Enviado

This Bell 47-G5A aircraft went through a total Ground-up Restoration and Complete Rebuild by a team of experienced BH47 technicians. Restoration completed in May 2014. Annual and 1200 Hour inspection completed May 2014 per Bell manuals All Applicable Airworthiness Directives and Service Bulletins complied with Aircraft fully disassembled to facilitate inspection, repairs and restoration. Removed existing wiring and installed new wiring, installed new scissor assemblies, installed new scissors bracket, NDT inspection of center engine frame and tailboom frame (treated with corrosion preventative materials), all new fuel, oil and hydraulic hoses, aircraft reassembled with all new hardware, installed overhauled hydraulic servos, installed overhauled engine accessories, installed boosted collective. Main Rotor transmission, main rotor hub, mast, swashplate and tail rotor gearbox received 1200 hour overhauls. All other lifed parts are completely tracked and have either been overhauled to factory spec or replaced.

Comments

Please log in or register to post a comment.

REGISTRO DE ACTIVIDAD
¿Deseas un historial completo para N8413D a partir de 1998? Compra ahora. Recíbelo dentro de una hora.
Fecha Aeronave Origen Destino Salida Llegada Duración
No Recent History Data
Los usuarios básicos (¡registrarse es fácil y gratis!) ven un historial de 3 months. Únete
 

Entrar

¿No tienes cuenta? ¡Regístrate ahora (gratis) para acceder a prestaciones personalizadas, alertas de vuelos y mucho más!
¿Sabías que el rastreo de vuelos de FlightAware se sostiene gracias a los anuncios?
Puedes ayudarnos a que FlightAware siga siendo gratuito permitiendo que aparezcan los anuncios de FlightAware.com. Trabajamos arduamente para que nuestros anuncios sean discretos y de interés para el rubro a fin de crear una experiencia positiva. Es rápido y fácil whitelist ads en FlightAware o por favor considera acceder a nuestras cuentas premium.
Descartar